View the map in detail >

SH 119 Pedestrian Underpass at Hover Street

Project Background and Recommended Improvements   

This project will provide a key pedestrian/bicycle connection between Dry Creek Drive and Pike Road as well as provide an alternative to the busy State Highway 119 (Ken Pratt Boulevard) and Hover Street intersection. A grade separated crossing of SH 119 is planned just southwest of Hover Street. This is the first of two projects that will comprise the City’s SW Longmont Underpass Projects.

View an overall site plan to see the proposed improvements.

Current Status

  • The City contracted with Loris and Associates to design the underpass, trail connections and associated enhancements.
  • All necessary right-of-way has been acquired and final design is complete.
  • The City awarded the construction contract to Zak Dirt, Inc. of Longmont, Colorado.
  • Construction began in May 2016.
  • The underpass opened for use in January 2017.

Partnerships

The SH 119 Pedestrian Underpass is a joint project between the City of Longmont, Boulder County and the Colorado Department of Transportation.

Funding

Funding for this project will be a combination of DRCOG TIP, Boulder County and City of Longmont funds. The City’s local match comes from the Transportation System Management (TSM) Program which is funded by the City’s 3/4-cent Street Fund sales and use tax.

Project Contact(s)

If you have questions or would like more information about this project, please contact Micah Zogorski


Hover Street Pedestrian Underpass at Dry Creek

Project Background and Recommended Improvements   

This project will construct a pedestrian underpass at Hover Street and Dry Creek. A grade-separated crossing at this location is identified on the City’s Multi-Modal Transportation Plan and will provide a safer connection between the Village at the Peaks and the commercial business district on the west side of Hover Street. This underpass will also tie-in to the Dry Creek Greenway trail. This is the second of two projects that will comprise the City’s SW Longmont Underpass Projects.

View an overall site plan to see the proposed improvements.

Current Status

  • The City contracted with Bohannan Huston to design the underpass, trail connections and associated improvements.
  • All necessary right-of-way has been acquired and final design is complete.
  • The City awarded the construction contract to Zak Dirt, Inc. of Longmont, Colorado.
  • Construction began in June 2016.
  • The underpass opened for use in August 2017.

Partnerships

The Hover Street Pedestrian Underpass is a joint project between the City of Longmont and the Colorado Department of Transportation.

Funding

Funding for this project will be a combination of DRCOG TIP and City of Longmont funds. The City’s local match comes from the Transportation System Management (TSM) Program which is funded by the City’s 3/4-cent Street Fund sales and use tax.

Project Contact(s)

If you have questions or would like more information about this project, please contact Micah Zogorski.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer
View Full Site